HMC offers turnkey platform decommissioning and removal services.
Reverse installation has been the method for executing all our platform decommissioning & removal projects. Click the images below to enlarge.
| Decommissioning |

|
|
The platform had to be completely decommissioned. Typical activities included:
- gas freeing, cleaning
- cutting and removal of conductors, risers and caissons
- installation of lifting aids
- structural cutting of modules
The crane vessel also acts as accommodation and support vessel.
|
Topsides Removal |
 |
|
Topsides are removed by reverse installation i.e. the modules are lifted from the platform and placed on a transportation barge or the deck of the crane vessel.
|
Topsides Offloading |
 |
|
The topsides are transported to a quayside for disposal or onshore storage. Offloading can be carried out by lifting, skidding or by means of trailers.
|
Jacket Preparatory Work |
 |
|
The Jacket is prepared for removal by installing lift points, rigging, spreader bars and other installation aids.
|
Pile Cutting / Soil Plug Removal / Conductor Removal |
 |
|
These activities require specialised cutting and soil plug removal equipment.
|
Jacket Removal |
 |
|
The Jackets is removed by reverse installation i.e. the Jacket is lifted from the sea bottom and placed on a transportation barge or the deck of the crane vessel.
|
Jacket Offloading |
 |
|
The Jackets are transported to a quayside for disposal or storage. Offloading can be carried out by lifting, skidding or trailers. |
Projects / Experience
A complete list of decommissioning and removal projects executed by HMC. Read more »