Year
|
Project
|
Milestone
|
|
2007
|
Independence Hub
|
Installation of world's deepest and heaviest export SCR, producing the heaviest SCR loads (800 t) at installation. (Gulf of Mexico)
|
|
2007
|
Independence Hub
|
Installation of world's longest mooring lines at 2.4 miles (3.86 km) each. (Gulf of Mexico)
|
|
2006
|
Independence Flowlines
|
Flowline initiated by deploying PLET in 2,740 m water depth. (Gulf of Mexico)
|
|
2006
|
Independence Hub
|
Water depth record for installation of mooring piles: deepest pile at 2,440 m (Gulf of Mexico)
|
|
2006
|
Atlantis
|
Deepest and heaviest PiP project. 24-inch SCR installed in 2,175m water depth.
|
|
2006
|
Mardi Gras
|
Deepest and heaviest SCRs (20” and 24") in 1,840 m water depth at Thunder Horse location.
|
|
2005
|
Benguela Belize
|
Installation of the first Compliant Tower in West African/Angolan water.
Installation of the heaviest Compliant Tower in the world: Total weight of 85,000 t.
Installation of heaviest single piece foundation pile: 108" diameter x 623 ft long weighing 1,000 tons each.
Installation of the 10,700 t North Module was a record lift for West African waters.
Installation of the 10,700 t North Module was the heaviest Thialf DP lift for HMC ever.
|
|
2005
|
Ormen Lange
|
Heaviest subsea template at 850 m water depth Dimensions 44.3 m x 32.7 m x 14.9 m (LxBxH) , 1,150 t
|
|
2005
|
Mardi Gras
|
Deepest installed pipelines
Mardi Gras Atlantis export pipelines (16” and 24” diameter) in water depths of 2,200 m
|
|
2005
|
Constitution
|
Deepest piles driven 1,539 m (world record)
|
|
2004
|
SP 89
|
Record lift jacket dual crane set down in Gulf of Mexico (3,900 t)
|
|
2004
|
Mad Dog
|
Largest diameter polyester rope installed
First permanent polyester mooring system in Gulf of Mexico
Largest diameter suction piles installed in the Gulf of Mexico
First 24" diameter SCR
|
|
2004
|
Holstein
|
Heaviest lift in Gulf of Mexico: 7,810 t
Largest combined offshore topside lifts in Gulf of Mexico
Largest diameter chain and strand wire handled and installed offshore
Largest spar towed and installed in the world
|
|
2004
|
Sanha
|
Heaviest lift in West African (and outside North Sea) waters: 10,290 t
|
|
2003
|
Marco Polo
|
Deepest foundation piles driven by (hydraulic) hammers: 1,310 meters
|
|
2002
|
Ringhorne
|
Heaviest deck lift in Norwegian waters: 11,520 t, Thialf
|
|
2002
|
Nakika
|
Water depth record for installation of a mooring system: 1,950 m (Gulf of Mexico)
|
|
2002
|
Frøy
|
Removal of the heaviest jacket to date in one piece: 7,100 t
|
|
2002
|
Horn Mountain
|
A world water-depth record for the installation of an offshore SPAR mooring system: 1,650 meters (5,500 feet) in the Gulf of Mexico.
|
|
2001
|
Malampaya
|
Heaviest float-over installation for Far East in unprotected waters: 11,500 t
|
|
2000
|
|
Biggest crane vessel in the world (Thialf):
- Crane capacity tested 7,810 t
- Crane capacity Certified 7,100 t
- Dual crane capacity certified 14,200 t
|
|
2000
|
Shearwater
|
Record lift topsides weight: 11,800 t, Thialf
|
|
1999
|
Jade
|
Heaviest lift jacket West African area: 6,985 t
|
|
1998
|
Baldpate
|
First Compliant Tower installation, water depth 503 m
|
|
1998
|
URSA
|
Deepest TLP installation 1,158 m
|
|
1998
|
URSA
|
Heaviest lift for Balder: 5,058 t, North module
|
|
1998
|
Ping Hu
|
Heaviest lift jacket Far East 5,850 t
|
|
1997
|
White Tiger
|
Heaviest topsides lift Far East 6,350 t (also record for Hermod)
|
|
1997
|
Ram Powell
|
Deepest TLP installation 981 m
|
|
1996
|
Mars
|
Deepest TLP installation 896 m
|
|
1996
|
Esmond
|
Heaviest jacket removed in a single piece, North Sea, 3,980 t
|
|
1995
|
HZ-32-2
|
Heaviest lift jacket Far East 3,639 t
|
|
1995
|
Xijang 30/2
|
Heaviest topsides lift Far East 4,220 t
|
|
1994
|
Pompano
|
Biggest self-upending launch jacket 34,895 t
|
|
1993
|
Goodwin
|
Deepest driven/drilled pile foundation:
- primary piles 2.65 m OD (length 135 m)
- insert piles 2.00 m OD (length 81 m)
- Final pile penetration: 181m below mudline
|
|
1993
|
East Brae
|
Heaviest lift jacket 9,300 t
|
|
1993
|
F-3 development
|
Record lift topsides weight (for Hermod): 6,003 t (topsides)
|
|
1992
|
Auger
|
Deepest TLP foundation templates, 600 t at 872 m
|
|
1992
|
Maui B
|
First pipeline installation using J-lay , 110 m waterdepth
|
|
1992
|
Scott JU
|
Heaviest skirt piles:
- 2,480 mm OD (97.6")
- length 121.5 m
- final penetration 102.5 m
- weight (121.5 m pile) = 592 t
|
|
1991
|
Snorre
|
Heaviest template installation (concrete), 6,000 t at 310 m
|
|
1991
|
Panuke
|
First Canadian offshore platform
|
|
1991
|
Piper B
|
Record lift topsides weight: 10,300 t
|
|
1991
|
Piper B
|
Provision of biggest grommet ever:
- 4,000 t SWL
- 396 mm diameter
- 70 m length
- 73,7 t weight
|
|
1991
|
Gannet
|
Heaviest lift jacket 7500 t
|
|
1990
|
Beryl A Riser platform
|
First use of 108" foundation piles
|
|
1989
|
Jolliet
|
Deepest TLP installation, water depth 537m
|
|
1989
|
Arbroath
|
First use of heaviest underwater hammer S-2300
|
|
1989
|
Harmony
|
- Deepest jacket in West USA 360 m
- Longest main piles: 490 m (8 no’s) dia.1,8 m
- 20 skirt piles dia 2.1 m, length 120m
- Total length of all piles 6,390 m
- Longest conductor string: 46 km (1,300 sections)
|
|
1988
|
Bullwinkle
|
- Biggest and deepest platform installation
- jacket weight 48,000 t
- waterdepth 411 m
- Longest skirt pile (one piece): 84"OD, length 165 m
|
|
1987
|
Oseberg B
|
First drilled conductor installation with reversed circulation drilling (length 252 m, 30" OD)
|
|
1987
|
Bullwinkle
|
Fabrication of biggest launch barge H-851, dimensions 260*63*15 m, maximum launch capacity 60,000 t
|
|
1986
|
Heritage test pile
|
Deepest skirtpile installation with underwater hammer MHU-1700, water depth 328 m. Pile length 58 m, pile diameter 72"
|
|
1984
|
Kotter
|
Record lift topsides weight 4,100 t
|
|
1984
|
Esmond
|
Record lift topsides 4,600 t (Balder)
|
|
1984
|
Hutton
|
First TLP installation
|
|
1983
|
Cormorant UMC
|
Heaviest Underwater manifold installation 2,300 t at 152 m water depth
|
|
1983
|
Namaroda 2
|
Biggest Brazilian launch jacket, 14,850 t, waterdepth 160 m
|
|
1983
|
Iwaki
|
Deepest Japanese platform 154 m water depth, jacket weight 15,750 t
|
|
1982
|
Magnus
|
Biggest self floating jacket 34,000 t
|
|
1982
|
North Rankin
|
Biggest Australian launch jacket 21,600 t
|
|
1981
|
Cormorant North
|
First use of underwater powerpack for hydraulic hammers
|
|
1980
|
Fulmar SALM
|
First dual-crane lift 3,240 t
|
|
1980
|
Fulmar
|
First use of slender underwater hammers in North Sea
|
|
1979
|
Murchison
|
Biggest launch jacket 25,240 t
|
|
1978
|
Piper Alpha
|
First platform installation with Semi Submersible Crane Vessel (Balder)
|