Mobil Producing Nigeria Unlimited awarded the East Area 1B EPIC scope of work to Hyundai. Hyundai then awarded  a subcontract to Heerema Marine Contractors (HMC) for the transportation and installation of the following EPC-1B facilities:

  • GX NLG Extraction Platform (Jacket, Piles and Float-over Deck)
  • GS Riser Platform (Deck)
  • GU Flare Platform (Jacket, Piles, Deck and Flare tower)
  • GN / GX Bridge B1
  • GX / GS Bridge B2
  • GS / GU Bridge B3

The GX Jacket was fabricated in Korea and transported on a Dockwise Swan Class vessel. The GX Deck is a float-over transported on the Dockwise Transshelf. All other facilities were fabricated in Port Harcourt, Nigeria and transported on 300' x 100' ft. barges.

Main Characteristics

Milestones
Offshore Start Date: 2006-Q1
Offshore End Date: 2007-Q4
Main Spread
Vessel: --
Transport Vessel(s): Thialf
Hamers: S-2300 / MHU-2100 + ancillary equipment
Main Technical Data 
GX-Jacket Weight: 1547t
Piles Weight: 2348t (4 x 108" OD)
GX-Topside Weight: 12,381t
GU-Flare Platform: Jacket weight; 97t
Piles Weight: 192t (3 x 30" OD)
Deck Weight: 119t
Flare Tower: 116t
GS Riser: Platform Topsides - Deck Weight; 147t
#1 bridge weight: 431t (~90m length)
#2 bridge weight: 303t (~110m length)
#3 bridge weight: 280t (~110m length)